Our QC Operation: Product Development——3Dmodel——Making Mould——Mould Trial——Die Casting——Machining——Polishing(Pealing-Cleaning)——Plating——100% Air Test of Plating Body Part(To Ensure Every Product To Avoid Gas Leakage) ——Assembling Cartridge——Water Test Leakage 100% ——Package——In Storage |
Product Development | 3Dmodel |
|
Polishing(Pealing-Cleaning) | Machining | Die Casting |
| 100% Air Test of Plating Body Part(To Ensure Every Product To Avoid Gas Leakage) | Assembling Cartridge |
In Storage | Package | Water Test Leakage 100% |